Product Description
Overlapping doors can be used in two special portals: one is small, but the other is large. The installation of overlapping doors can reflect the overall aesthetics of the import and export, and the overlapping doors and fans of the overlapping doors are synchronously linked, so that the operation effect is better.
Load-bearing (double) |
2*150kqs |
Door bearing (four fans) |
4*120kgs |
Width |
700-1500mm |
Opening speed |
100-550mms (adjustable) |
closing speed |
100-550mm/s (adjustable) |
Electric machinery |
24v100w2300rpm |
Opening time |
0-60s (adjustable) |
Power input |
AC9OV-250V50-60HZ |
Adaptation to temperature |
-10°c degree ~70°C degrees |
1. Anti-clip: there are strip pressure sensors mounted at the entrance /exit columns, once the passenger is bumped , the door will stop immediately. Once the person leaves, the door resumes normal speed.
2. Anti-colide: on the top-front of the display case, there's one wide-rang infrared sensor. If the wing approximates near the passenger, the door will speed down and stop. When the passenger moves forward, the door will resume rotating again.
3. Emergent stop: in case of emergency, just press down the red button and the door will stop immediately. When emergency removed, turn the button clock wise and the door will return to normal working.
4. Disabled: the disabled button can be used when there's disabled passing-by. The door will keep running one cycle at low speed to ensure the safety.
Adaptation to temperature -10°c degree ~70°C degrees
Our Service
1) Professional manufacturer and exporter with 18 years production and engineering experience;
2) Free CAD design,R&D department welcomes your OEM&ODM projects.
3) Self-developed mold and durable products.
Packaging & Delivery
Wooden Cases, could meet international shipping packaging perfectly.
Port: Shanghai Port
Lead Time :
Quantity(Units) |
1 - 1 |
2 - 10 |
>10 |
Est. Time(days) |
7 |
25 |
To be negotiated |
Purchase Step
Step 1: Send an inquiry to us.
Step 2: Send detailed project drawings or dimensions to us.
Step 3: We provide the solution and quotation.
Step 4: Negotiation and details discussion.
Step 5: Place order and arrange deposit.
Step 6: Make detailed shop drawing for approval before production.
Step 7: Arrange production after the shop drawing confirmed.
Step 8: Quality control and Inspection.(Production pictures will be provided for checking)
Step 9: Arrange balance
Step 10:Arrange shipping after received the balance.
Step 11:Provide shop drawing for installation
Step 12: After sales
Please contact us if you have any concerns with your order. We are dedicated to 100% satisfaction and we will make sure you are happy with your purchase. We hope you will see that we offer 5-star service.
https://shaneok.en.made-in-china.com